Friday, May 24, 2013

BELLAVITA ALAMINUS BY AYALA LAND









Reservation

Here are some steps you can follow in owning your dream home at BellaVita Alaminos!
  1. Talk to us the Accredited Agent (RISE AND SHINE REALTY,INC) or contact us or text on our mobile no.09393793021 smart/ 09062783440 globe to further explain the project to you. 
  2. Choose the Model Unit and Block and Lot according to your preference
  3. We will give or send a sample computation according to the terms indicated and your capacity to pay
  4. Reserve a unit for only P2,500 and sign the Reservation Agreement.
  5. Documents should be sent to the developer within a month, payment of equity is after 1 month from the date of Reservation, either thru Post dated Checks or Auto Debit Application at BPI.
Composition of Other Charges

•Real Property Tax (RPT) on Land and Building
•Registration Fees
•Transfer Tax
•Documentary Stamps
•Meralco Connection
•Water Connection

Documentation

The documents you will forward to BellaVita Land Corp., depends on your employment status: 

Locally Employed
  • Current 3 months payslip
  • Income Tax Return
  • Certificate of Employment & Compensation
  • 2 Valid Id, Tin ID, Company ID
  • Proof of Billing
  • 4 pcs 1x1 picture
  • Birth or Marriage Certificate
  • MSVS – Pag-ibig
  • Postdated checks for the Equity - payable to BellaVita Land Corp.

Conditions for UNIT TURN-OVER (TO)
  • Constructed House (6 months construction)
    • Good Payment Record
    • Loan Take out (for financing Terms)
    • Signed TO Agreement

    Deed Of Restrictions – Ayala Property Management Corp. (APMC)
    1.Rules on Expansion – horizontal expansion for end units
    2.Fencing – 1 meter concrete, 1 meter grills
    3.Deep well – not allowed
    4.Pets – Maximum 3 domesticated pets, not allowed to go astray
    5.Generator – installed in a separate housing enclosure. Noise level limit is 75 decibels.
    6.Satellite Dish – yes w/ clearance to APMC
    7.Store – only if they bought store lots.

    All improvement plans will be submitted to APMC at least 30 days, APMC shall approve all deny palns w/in 21 days

    Move in & Deed of Restrictions

    Conditions to START HOUSE CONSTRUCTION
    • Complete Land Development
    • Complete Documents and payments of DP
    • Release of Notice to Construct



No comments:

Post a Comment